Kharar (Gr Mohali) : SERVICE PROVIDER – ELECTRIC METER. (07 Dec 2013)

1.       M/s Mohali Electricals (Consultant & Electrical Contractor) has been identified who can help the allottee in securing Electrical connection. The vendor’s profile and documents required to apply for electric connection are attached.
2.       The allottees who desire to utilize his services can directly get in touch with him. It is pertinent to mention that the site office/ the board has initiated this service for the ease of the allottees and will not be responsible for any type of transaction between the service provider and allottee.

Respected Sir

We are company dealing in assistance of people for getting electrical connections for housing, Industries, residential projects, temporary connection or any kind of installation in Mohali, Zirakpur, Kharar, Chandigarh etc since 1994. We have team of qualified Engineers and Technicals for complete electrical work.

As per your project our services are required for getting the energy meters installed by the local electricity department to individual customers  meters at their residence and the required load of the flats will be taken as under:-

NO OF BHKS

LOAD

SECURITY (Rs.)

2 BHK

7.000 K.W.

 8,520

3 BHK

10.000KW

 16,880

1 BHK

5.000KW

 6,280

4 BHK

12.000KW

 19,870

Drafts will be infavour of PSPC Ltd, Mohali

Note:- The Load above 7K.W. will be treated as 3 phase connection as per the PSPCL Norms

Documents required by the individual will include:-
1. Possession letter or Allotment letter
2. Photo of the allottee
3. If the allotment is in more than one member then the other member will give NOC to primary member in whose the connection is to be released(Sample Copy Attached).
4. ID proof of the member (Except Pan Card Copy)
5. Witness Bill (Will be Provided by us)

Above that we will be charging Professional charges of Rs 2500/- for Three phase connections and Rs 1500/- for single phase connections that includes complete paper formalities i.e. Filling of forms, A-class contractor test report, NOC's if required. The meter will be installed in the junction provided within time period of 10-15 days after depositing the securities. The service will be provided at one point so that there is no inconvenience to the members.

For further any queries you are most welcome to call me anytime. Mr Amritpal Singh M.NO-9988814985

Thanks and regards

Mohali Electricals
D-1 Indl.Area Phase-1 
Mohali

Click here for Form No.CS-1-A of Punjab State Power Corporation Limited - Application and Agreement Form for DS / NRS (LT only)